    PDF Printable Version

     

    Revised :  January 2007

     

    WALLENPAUPACK LAKE ESTATES - PROPERTY OWNERS ASSOCIATION

    BUILDING REGULATIONS

    AMENDMENTS SUMMARY

    November 13, 1999 -Article VII, Section 17 Satellite Dish – Non-fee permit required        

    July 24, 1999- Split-rail fences rules added with specifications      

     July, 2001- Article VII, Section 6 -  Split-rail fence rules rescinded and split-rail fences no longer permitted.                                          

    August, 2003- Revisions as follows:

    Article IV, Section 6 – Surveys need to include actual planned driveway and parking locations; same requirement for resurvey.                                                                            

    Article IV, Section 11 – WLE Letter of Compliance is required prior to occupancy or use of new construction.    

    Article VI, Section 4 – Tree clearing for placement of a modular foundation or modular home now both require replacement of trees in the area cleared for a crane.          

    Article VI, Section 7 – All siding and trim colors, except white trim, must conform to WLE color chart.               

     Article VI, Section 9 – Outside air conditioners cannot be placed in the setbacks, easements, or right-of-way areas of WLE.   Section 10 – Approval is required to place anything in these areas.                                                                       

    Article VII, Section 7 – Landscaping pools greater than 32 sq.ft. require a permit                                                         

    Article VII, Section 9 – Detached fabric and screened structures are only allowed for temporary, seasonal use, and not allowed for storage buildings.                                      Article

    VII, Section 16 – Sheds may be 10’x12’, gazebos 10’x10’ (100 sq. ft.)

    December 2003 Revisions:                                                          

    Article V, Section 2A – Felled trees must be cut up into 18” or shorter lengths and stacked within the property lines or removed from the property.              

    Article X, Section A5- The total impervious area (buildings, paved and concrete surfaces) on a lot cannot exceed 33% of the lot area for a single lot or 25% of the lot area for two or more combined lots.

    April 2005 Revision:                                                                          

    Article VI, Section 4 -  Replacement tree size increased to 8’-10’ and a fine imposed is trees not planted before LOC issued. 

    December 2005 Revision:

    Article 5, Section 2:  New sewer and water taps will only be allowed from April 15 to November 15.

    January 2006 Revision:

    Article VI, Section 16 – Lot numbers changed to 911 Address on a post by driveway.

    March 2006 Revision:

    Article IV, Section 11 -  Builder must submit evidence of purchase of an approved 2 hp Myers pump when a grinder pump has been installed before the WLE L.O.C. will be issued.

    January 2007 Revision:

    Article VII, Sec. 17 – Changes to Satellite Dish Rules.  More than one dish is allowed.  No permit is required but office must be notified of installation.  Size limit is 39”.  Location is outside of easements and right-of-ways.

    Article VI, Sec. 2 – Change to contractor hours; no outside Saturday work.

     

     

    A courtesy advisory regarding contractor’s insurance has been added to WLE permits for WLEPOA members as WLE lot owners planning or undertaking construction or other work by contractors or other laborers/workers at their property in WLE.  You cannot rely upon this advisory, since it may not pertain to your situation or relationship with your contractor, and is not intended as a substitute for sound, thorough and quality advice personally obtained by you from skilled, competent professionals.  In your interest or for your protection, you should consult with appropriate, qualified professionals and experts for advice and guidance for your personal and private transactions with others; otherwise you proceed at your own risk.  The Association does not warrant, assure or vouch for the accuracy, thoroughness and legal significance of such advisories, and does not check for, investigate, verify or continue to verify, or monitor any information about contractors, and any of their characteristics and attributes, such as their business, skills, quality of workmanship, performance, reliability, and financial standing, and any document or information required of or submitted or affirmed by them.  The Association is not required to procure, verify or maintain any information about contractors or any of their characteristics and attributes, and disclaims all warranties, liability and responsibility for the effects and consequences of heeding or your not heeding such an advisory, and the contractors’ compliance or noncompliance with their information and affirmations.  The documents and other information submitted to the Association by or on behalf of contractors is for WLEPOA’s use and benefit, but is available to its members as many of its other records are.

    WALLENPAUPACK LAKE ESTATES - PROPERTY OWNERS ASSOCIATION BUILDING REGULATIONS

    ARTICLE I

    Building Permit Requirements

     

    A Building Permit is required for all construction and includes, but is not limited to, dwellings, alterations, decks, (attached and unattached), additions, garages, gazebos, sheds, stairs, porches, dormers, and demolishing with the intent to rebuild.

     

    ARTICLE II

    Prerequisites

     

    Section 1

    All Dues, Sewer and Water fees, Special Assessments and Fines must be paid, before the issuance of a Building Permit.

    Section 2

    When required, the Paupack Township Building Permit must be issued prior to the W.L.E. Building Permit.

    Section 3

    Schedule "A" Deed Covenants shall be part of these Building Regulations whether or not specifically cited within these regulations.

    ARTICLE III

    Permit Fees

     

    Upon acceptance of application for a building permit the following fees will be collected:

     

    Section 1

    Construction of Home (as per original submitted plans)……… $500.00

    Sewer & Water Hook-Up (See S & W Regulations) …………$1000.00

    Permit Renewal after one year …………………. ………………$50.00

     

    Section 2

    Miscellaneous Construction:

    A.     New: To include but not limited to decks, porches screened or enclosed. Garages, additions, dormers……………$0.25 sq.ft

    B.     Sheds and gazebo and deck replacement to same dimensions……………………………………………... $25.00

    C.    Permit renewal after one year …………………………. $50.00

    D.    Maintenance/Landscaping/Stairs/Fuel Bins (Must Be within setbacks)……………………………………………. N/C

     

    ARTICLE IV

    Definitions

     

    Section 1 Building Permit - Wallenpaupack Lake Estates: Issued by the Building Compliance Officer or the Building Committee that permits construction on property within Wallenpaupack Lake Estates. A Building Permit is valid for one (1) year from the date of approval of the building package. Contractor/Owner must completely enclose the entire exterior of the building including decks, porches, stairs, etc. within six (6) months from the date of excavation. This also pertains to the construction of, but is not limited to, additions, garages, and screened-in-porches when constructed under a separate Miscellaneous Permit issued after the occupancy of a dwelling.  Shed permits shall be valid for a period of 6 months.

     

    Section 2 Building Permit - Paupack Township: Issued by the Paupack Township Building Inspector when required, and must be submitted with the W.L.E. Building Application.

     

    Section 3 Non-Fee Permit: Issued by the Building Compliance Officer or the Building Committee Office. Required for certain exterior maintenance, a satellite dish (see Article VII, Section 17), and landscaping. There is no fee and the permit is valid for thirty (30) days from the date of issue.

    Non-Fee Permits may be renewed once for an additional thirty (30) days. All work must be completed within sixty (60) days.

     

    Section 4 Building Plans: Comprehensive plans of the proposed construction showing the following information at 1/8" or Ό" per foot scale: Floor Plans -

              Elevations - Height of building from mean grade.

     

    Section 5 Setbacks: Distance on the front, rear, and both sides of the property lines to the construction.

     

    Minimum required Setbacks:

    60' Building to center of road.

    10' Building to side and rear lot line.

    30' Corner lots - Building to centerline of side road.

    30' Deer Lake - Building to water edge.

    10' Beaver Lake - Building to rear property line.

     

    Section 6 Survey: The survey must be signed and sealed by a Pennsylvania licensed surveyor showing the following information: Size of the lots; property lines; required setback lines; location of building on site; existing road; proposed road and right-of-way widths as shown on recorded maps of W.L.E. to point nearest the front setback line; the perpendicular dimensions from one side of the property line to each corner of the dwelling on that side; the proposed driveway location; elevations including road elevation; building corner elevations on the existing grade prior to construction; elevation on fixed boundary pin. This survey shall also include all building appurtenances (decks, stairs, chimneys, etc.).

     

    Section 7 Resurvey: Survey signed and sealed by a Pennsylvania licensed surveyor, containing all the provisions of the survey (including actual parking, driveway, and culvert locations) after the footings and/or slab have been completed. The Resurvey must be approved prior to continuing construction operations.

     

    Section 8 Lot Clearing Permit: Permit issued as part of the building package to allow the removal of trees and brush in order to construct the building or addition in accordance with the submitted plans. Only trees necessary for construction may be removed. Trees for removal must be marked and approved for removal by the Building Compliance Officer or the Building Committee. A Lot Clearing Permit allows only tree removal, excavation, and the installation of footings and/or slab. The permit is valid for six (6) months from the date of approval.

     

    Section 9 Certificate of Occupancy: Issued by the Paupack Township Building Inspector when construction is completed and the final inspection is approved. New homes may not be occupied until the Certificate of Occupancy is issued.

     

    Section 10 Certificate of Use: Issued by the Paupack Township Building Inspector for construction where occupancy is not an issue after the construction is complete and the final inspection has been approved.

    Section 11 Letter of Compliance: Issued by the Building Compliance Officer or the Building Committee after the Certificate of Occupancy and/or the Certificate of Use have been issued by the Paupack Township Building Inspector, and the W.L.E. final inspection has been approved.   If the L.O.C. is for a new home and a grinder pump was installed, the builder must submit evidence (copy of receipt) that an approved 2 hp Myers pump was used before an L.O.C. will be issued.   If you fail to pass the W.L.E. final inspection, there will be a fee of $25.00 per each additional inspection thereafter.  Both the Paupack Township Certificate and the WLE Letter of Compliance must be obtained prior to occupancy or use.

     

     

    ARTICLE V

    Building Permit Application

     

    Section 1 Requirements: W.L.E. Building Permits are obtained by submitting a completed application to the Building Office containing the following:

    Two (2) sets of construction plans.

    Copy of Recorded Deed with Schedule "A" attached (if deed is   

    not on file at WLE)

    Insurance certificate (for contractor if not on file at WLE)

    Survey

    Permit Fee

    Sewer & Water Hook-Up Fee

    Copy of the Paupack Township Building Permit

     

    Insurance Certificate: A Certificate submitted by the general contractor or the property owner showing insurance coverage for liability and property damage and naming W.L.E.P.O.A. as certificate holder on the policy. The insurance certificates must show a minimum amount of insurance coverage of $1,000,000 when the estimated cost of construction exceeds $10,000 and a minimum amount of $300,000 when the estimated cost of construction is $10,000 or less.

     

    Section 2 Procedures: Upon approval of the building application, one set of accepted plans will be returned to the party submitting the application. A Lot Clearing Permit will then be issued which allows for necessary tree removal, excavation and installation of the footings and/or slab. A resurvey must then be submitted Prior to any further construction. Upon approval of the resurvey, the Building Compliance Officer or member of the Building Committee will post the W.L.E. Building Permit at the construction site and construction work may then continue. No excavation will be permitted except as required to accommodate building foundations, sewage and water lines, driveways and underground utilities.  New sewer and water taps will only be allowed from April 15 to November 15.

    When submitting the resurvey for approval, the following conditions must be met before a BUILDING PERMIT will be issued:

    A.     Trees felled must be removed from the property or cut into eighteen inch (18”) lengths or less and  stacked within the property lines.

    B.  Tree stumps must be removed from the property.

    C.     Tree branches and cut brush must be chipped or removed  

          from the property.

     

    Section 3 Building Permit Renewal: Building Permits may be renewed once, with the proper renewal fee, and will be valid for a period of six (6) months from the date of expiration of the original permit. After that time, a new building application and required fee must be submitted to continue construction.

     

    Section 4 Contractor Responsibility: General contractors are responsible for notifying their sub-contractors of the W.L.E.P.O.A. Building Regulations, Sewer and Water Regulations and the penalties for failing to comply.

     

    Section 5 Miscellaneous Construction: A copy of the resurvey, showing all existing and proposed additions, is acceptable for miscellaneous construction. A signed statement is required indicating accuracy of information provided.

     

     

     

    ARTICLE VI

    Regulations

     

    Section 1 Contractors Vehicle Pass

    All contractors, sub-contractors and their employees must secure a contractors vehicle pass for each vehicle, which must be displayed on the vehicle for identification purposes.  Contractor passes are valid for the period shown on the pass.  The cost per year is $20.00. These passes are non-transferable and good only for working hours.

     

    Section 2 Hours of Work

    Contractors are allowed to enter WLE property for work  Mon. through Fri. 8 A.M. to 6 P.M.    Saturday 9 A. M. To 5 P.M. for interior work only. No work on Sundays or the following holidays: New Years Day - Memorial Day - July 4th - Labor Day - Thanksgiving - Christmas.

     

    Section 3 Building Plans Canceled

    If excavation is undertaken and building plans are canceled, the site must be restored to its original grade within thirty (30) days from date of cancellation or the P.O.A. will contract to restore the property at the property owner’s expense.

     

    Section 4 Tree Removal

    Any trees removed without written approval or removed for the purpose of placing either a modular foundation system or a modular home on the foundation, must be replaced with trees of at least 8’-10’ in height. The number and location of the replaced trees shall be determined by the Association. The replacement trees must be planted to receive a Letter of Compliance prior to occupancy.  Occupancy prior to receipt of an LOC will result in a $100.00 fine per month and suspension of member privileges until the trees are planted and an LOC issued.  Requirements of Article V, Sections 2A and 2C apply to cut trees, including trees cut under a WLE tree removal permit.

     

    Section 5 Unsightly Building Site

    No building site shall be kept in an unsightly manner as determined by the Building Compliance Officer or the Building Committee.

                                                                           

    Section 6 Parging

    Masonry and/or concrete foundations exposed 6" over the final grade shall be parged.

     

    Section 7 Exterior Color

    All exterior building walls, roofs, structures and/or alterations must conform with the approved W.L.E. color chart of earth tones with consideration for standard modular home colors.  Trim colors , except white, must conform to the WLE color chart.

     

    Section 8 Fuel Tank Concealment and Location

    Fuel tanks, excluding liquefied gas containers, shall be concealed by lattice work or shrubbery. All exterior fuel tanks are to be located at the side or rear of the structure, where possible, and must be in compliance with the existing State Codes.

     

    Section 9 Fuel Bins

    Must be architecturally integrated with house - RE: Color, siding, etc.. The location is subject to approval from the Building Compliance Officer or Building Committee.

     

     

    Section 9a Air Conditioners

    Air conditioners located outside the structure must be located outside of the surveyed WLE setbacks, easements, and right-of-way areas.

     

    Section 10 Easements

    A permanent easement for drainage and utilities is established 5 feet along side lot lines, 10 feet on rear lot lines and 10 feet along street right-of-way lines.  Approval is required to place anything in these areas.

     

    Section 11 Erosion Control

    Upon final regrading, erosion control is required as per Penn. Title 25, Chapter 102, Erosion Control, before a Letter of Compliance will be issued.

     

    Section 12 Regrading

    All sites are to be cleared of debris and regraded as soon as possible and must be completed prior to the final inspection by the W.L.E.P.O.A. Building Compliance Officer.

     

    Section 13 Modular Homes

    A. The Manufacturer of a Modular Home must submit an AFFIDAVIT stating that the building is of Modular construction and not a mobile building. No permit will be issued until the affidavit is submitted.

    B. All modular sections are to be set on foundations within 48 hours of delivery, including removal of trailer from Wallenpaupack Lake Estates.

    Section 14 Blasting

    A. All blasting contractors will be required to register with the W.L.E.P.O.A. office prior to blasting.

    B. The contractor shall be liable for all damages to persons or property caused by the blast(s) or explosion(s) and submit insurance certificate in the amount of $1,000,000.00 for liability and property damage to the W.L.E. office.

    C. The contractor shall notify W.L.E. Security to close off the road to both vehicle and pedestrian traffic during blasting.

    D. No drilling or blasting is permitted on Holidays or weekends.

     

    Section 15 Notice of Violation - Stop Work Order

    All construction must comply with the approved plans. Deviation from these plans will result in a Notice of Violation and/or a Stop Work Order. All Notices of Violation will be conveyed by telephone and followed up in writing. The contractor/owner will have Fifteen (15) days or less to bring all work into compliance with approved plans. The W.L.E. Building Compliance Officer or member of the Building Committee will inspect the corrected work and, if approved, will issue a written order of Continuance. If the violation is not corrected within the required fifteen calendar days, a "STOP WORK ORDER" will be issued. Thereafter, no work of any kind may continue at the site until the Building Compliance Officer or the Building Committee and the contractor/owner resolve the construction problems and a written "ORDER OF CONTINUANCE" is issued.

     

    Section 16 Address Numbers

    The 911 Address numbers are to be a minimum 3” high, reflective numbers placed on a 4’ post on the

    house side of the driveway about 10’ from the edge of paving.  The numbers should be on both sides of the sign and visible from both directions.

     

    Section 17 Letter of Compliance

    A. Upon receipt of the Certificate of Occupancy, and /or the Certificate of Use, issued by the Township of Paupack, the contractor shall then present copies of the appropriate certificate(s) to the Building Committee Office, and request a final inspection.

    B. If the Building Compliance Officer finds the site to be in compliance, a "Letter of Compliance" will be issued. If you fail to pass the final inspection, there will be an additional fee of $25.00 per inspection thereafter.

    C. THE ASSOCIATION CONSIDERS ALL CONSTRUCTION TO BE INCOMPLETE UNTIL A "LETTER OF COMPLIANCE" IS ISSUED.

    D. Association representatives, in order to enforce the rules of the Association, have the right to enter onto the land of any property owner for the purposes of determining compliance with the Building Rules and Regulations.

     

    ARTICLE VII

    Prohibition

     

    Section 1 Advertising Signs

    NO ADVERTISING SIGNS ALLOWED. No signs for advertising purposes shall be erected or maintained on the premises or on or in any buildings on the premises.

     

    Section 2 Temporary Residence

    No temporary structures of any kind are permitted as a residence including but not limited to, trailers, basement, tents, shacks, garage or barn.

     

    Section 3 Driveway Requirements

    Maximum width of driveway entrance to property shall be 20’ wide, including circular driveways. A culvert pipe, if necessary, must be installed under the driveway, along with drainage ditches where required. Size of culvert shall be determined by on site conditions.

     

     

    Section 4 Water & Sewer

    No individual water supply or sewage system will be permitted (as dictated by Schedule "A").

     

    Section 5 Exterior Lighting

    All exterior lighting shall be directed away from adjoining property. Pole lights installed by PP&L are Prohibited.

     

    Section 6 Fences

    Perimeter fences are not permitted . Fences for landscaping and vegetable gardens, not to exceed 4'0" in height and 100 sq.ft. of enclosed area, are allowed.  6’ metal mesh deer fences around new trees are allowed.  Split-rail fences are no longer permitted.  Existing split-rail fences, per ruling of July 30, 2003, must be removed if: (a) they deteriorate to the point of needing repair, or (b) the property is sold. 

     

    Section 7 Pools

    Above or in-ground pools are not permitted.  Landscaping pools or water fountains (over 32 sq.ft. in area) require prior WLE approval and a landscaping permit before installation.

     

    Section 8 Spas

    Spas and hot tubs must be part of the main structure with a lockable 5'0" enclosure. 

     

    Section 9 Screened Structures

    Detached permanent screened or fabric structures are NOT permitted. However, portable removable screened-in facilities are permitted for seasonal use.

     

    Section 10 Color of Products

    Aluminum and canvas patio products, including awnings, shall conform to all Building Regulations and WLE approved colors.

     

    Section 11 Construction Equipment Movement

    No construction equipment shall be placed or used on any road unless it is equipped with rubber tires. All equipment moved from site to site must be moved on flatbed trucks. The contractor will be liable for all damages for failure to comply.

     

    Section 12 Commercial Vehicle Parking

    No commercial vehicles over 7500 lbs. gross weight may be parked on W.L.E. property except when active construction is in progress.

    Section 13 Vehicle Parking

    Vehicles are not allowed to park on the roadway.

     

    Section 14 Burning

    Open fires or the open burning of any construction materials are prohibited.

     

    Section 15 Compactor

    No dumping of construction debris in the compactor is permitted. Contractors or sub-contractors are not permitted to use the W.L.E. compactor.

     

    Section 16 Dwelling Requirements

    A. Multi-family homes are not permitted. Only single-family dwellings are permitted.

    B. A single-family dwelling shall be no more than two levels, containing a minimum of 800 sq.ft. of floor space, with a minimum of 550 sq.ft. of floor space on the first level of a multi-floor dwelling.

    C. Building shall not exceed two levels in height above the foundation. The maximum height from the mean finished grade to the high point of roof cannot exceed 29'0".

    D. CARPORT/GARAGE: The minimum size of a carport or garage (with garage door), is 12 feet by 24 feet (288 sq.ft.). The maximum size shall not exceed 24 feet x 28 feet (672 sq.ft.). Carports shall be no higher than 15 feet from mean grade. Detached  garages shall be no higher than 15 feet from mean grade. Carports must be part of the main structure.

    E. NO LEAN-TO’S are permitted to be attached to any structure.

    F. Only one (1) shed and/or gazebo is permitted per lot. Sheds can be no larger than 10’x 12’ and gazebos no larger than 100 sq.ft., and neither can be higher than 15' from the mean grade.

    Section 17 Satellite Dish

    1.       No permit is required, but the office must be notified of the installation.

    2.       Maximum size dish  is 39”.

    3.       More than one dish is permitted if needed to receive signals from different sources.

    4.       Installation:

    (a)   Mounted to dwelling no higher than 12’ above highest point, or on a 12’ pole on the ground.

    (b)   Ground installation must not be within WLE easements or road rights-of-way.  That means 5’ from sidelines, 10’ from rear line, and 30’ from center of the road (35’ on 50’ R.O.W).  No tree installations are allowed.

    ARTICLE VIII

    Variances Hearings – Appeals

     

    Section 1 Procedure

    If due to unusual conditions, the owner finds that compliance with the Building Regulations results in unnecessary hardship, owner may apply for a variance.

    A. The request for a variance shall be made in writing to the W.L.E.P.O.A. stating the reasons for such variance and the type of hardship caused. The owner shall submit copies of the same letter to adjoining property owners and request them to submit their comments to the Association within thirty (30) calendar days. If no comments are received, it will be assumed that adjoining owners approve the request for the variance.

    B. The owner seeking a variance must submit the site plan showing names and addresses of adjoining property owners and proof that adjoining owners were notified. Such proof shall be submitted by certified mail, return receipt, with copy of letter.

    C. A hearing will be scheduled before the Building Committee within thirty (30) calendar days after receiving proof of service. Notification to the Property Owners and/or Builder of the hearing date shall be by Certified Mail, return receipt requested.

    D. The property owner and/or their agent or representative may appear at the hearing on the date indicated and present any facts substantiating the hardship and the reasons why the variance should be granted.

    E. The maximum number of continuances shall be two (2).

    F. The Building Committee shall consider all pertinent facts and submit in writing to the Board of Directors their recommendations together with the reasons for their decision.

    G. The Board of Directors, after reviewing all the facts and the recommendations of the Building Committee, shall be responsible to render the final decision regarding the variance application.

     

    ARTICLE IX

    Fine Assessment

     

    Failure to comply with the W.L.E.P.O.A. Rules and Regulations will result in the assessment of fines on the Contractor/Owner, as noted in the "Fines Index" included in these regulations. All fines must be paid within Thirty (30) days of notification that a fine has been assessed. A subsequent offense committed after one year from the previous offense will be considered another first offense for the purpose of fine assessment.

     

     

    ARTICLE X

     

    WALLENPAUPACK LAKE ESTATES PROPERTY OWNERS ASSOCIATION

    REGULATIONS FOR LANDSCAPING - TO INCLUDE

    DRIVEWAY-PARKING AREAS-RETAINING WALLS-SITE DRAINAGE-CULVERTS-

    STRUCTURAL PLANTERS-GRADE CHANGES.

     

    A. GENERAL

    1.      All landscaping performed within the bounds of the Association, shall require a non-fee permit, with the following exceptions:

    a.              Property Owners performing any landscaping operation requiring manual equipment only.

    b.              When W.L.E.P.O.A. Building Permit issued for construction of a home is in effect.

    Upon submittal of landscaping proposal, and its approval by the Wallenpaupack Lake Estates Building Compliance Officer, a Non-Fee Permit will be issued.

    2.      Landscape construction of retaining walls or involving elevation changes require a drawing reproduced from the resurvey showing   the retaining wall boundaries and/or the elevation change.  

    3.      No creosote wood may be used within the bounds of Wallenpaupack Lake Estates. No creosote may be applied to existing wood.

    4.      All landscape contractors are required to comply with the requirements in the Building Regulations pertaining to Contractors Vehicle Passes and Insurance Certificate.

    5.      The total area of impervious surface improvements on a lot, including all buildings and paved and concrete surfaces, shall not exceed 33% of the lot area.  On two or more combined lots the impervious area shall not exceed 25% of the lot area.

    B. DRIVEWAYS

    1. Driveways shall be constructed exactly as shown on resurvey.

    2. The driveway entrance can be a maximum width of 20 feet.

    3. No permanent construction shall be constructed upon an Association drainage easement.

    4. Existing right-of-way grades shall NOT be changed.

    5. All driveway fills shall be of suitable material subject to the regulations of the Pennsylvania Department of Environmental Resources.

    C. PARKING AREAS

    1. Parking areas shall be constructed exactly as shown on the resurvey.

    2. All parking areas within W.L.E. utilities easement, which must be removed and/or replaced, will be done at the owners expense. No permanent construction is permitted.

    3. No parking area may be constructed within a WLE Right-of-Way without written approval of the Building Compliance Officer.

    4. Parking area fills shall be of suitable material subject to the regulations of the Pennsylvania Department of Environmental Resources.

    5. After the Letter of Compliance is issued for the dwelling, no parking area may be constructed without the written approval of the Building Compliance Officer.

     

    D. SITE DRAINAGE & CULVERTS

    1. Unless specifically authorized by the Association, NO drainage pattern or storm water flow may be altered.

    2. No property owner (other than WLEPOA or the Association) may direct additional drainage of surface water onto or into the road right-of-way or adjoining property without a landscaping permit.

    3. Where a drainage ditch or swale exists and a culvert pipe is required, a pipe of materials conforming to Penn Dot form 408, Section 600 and of a size determined by the Association, shall be installed along the center line of the drainage ditch or swale in accordance with  Penn Dot standard details.

    4. The final determination of the need for and location of  drainage ditches and swales rests with the Association.

    5. A culvert requirement determination shall be made by the Association on the date of issuance of the "Lot Clearing Permit" or later if conditions warrant.

    6. The culvert, if required as part of a new house building permit, must be in place and installed to the above specifications prior to the issuance of a "Letter of Compliance".

    E. RETAINING WALLS

    1. A retaining wall shall be considered to be any non-dwelling wall built to keep a bank of earth or other materials from sliding.

    2. No retaining wall may be constructed upon any Wallenpaupack Lake Estates drainage easement or right-of-way.

    PENALTIES

    1. The Association shall impose a fine, as stated in the fine index, on any contractor or owner who violates any of the provisions of the driveway, parking areas, retaining walls, site drainage and culvert regulations.

    2. If the contractor or owner fails to comply with the driveway, parking area, retaining walls, site drainage and culvert regulations within thirty (30) days after the imposition of the fine, W.L.E.P.O.A. will correct the violation and bill the contractor or owner for the corrective action

    3. No "Letter of Compliance" will be issued by the Association until all driveway, parking area, retaining walls, site drainage, and culvert construction is in full compliance.

    ARTICLE XI

     

    FINE INDEX

     

    ARTICLE 1: (BUILDING PERMIT REQUIREMENTS) FINE $500.00

    (Building Permit Requirements) Clearing or construction without

    first obtaining a Lot Clearing or Building Permit or deviation from

    the submitted plans without approval.

     

    ARTICLE V: SECTION 2: (PROCEDURES) FINE $500.00

     

    Continuing construction without obtaining approval of the resurvey.

     

    ARTICLE IV: SECTION 1: (BUILDING PERMIT - W.L.E.) FINE $500.00

     

    Failing to complete the exterior of the building including decks,

    porches and stairs within six months. The fine will be assessed each

    six month period the building exterior is not completed.

     

    ARTICLE VII: SECTION 14 (BURNING) FINE $1000.00

    Open burning of debris or construction materials.

     

    ARTICLE VII: SECTION 11 FINE $500.00

    (CONSTRUCTION EQUIPMENT MOVEMENT) PLUS DAMAGES

    Moving construction equipment not equipped with rubber tires without a flat bed trailer.

     

    ARTICLE VII: SECTION 1 (ADVERTISING SIGNS) FINE $25.00

    Advertising signs are not permitted.

     

    ARTICLE V: SECTION 2: (PROCEDURES FINE) $100.00 PER TREE PLUS REPLACEMENT

    Removal of trees unnecessary for construction.

     

    ARTICLE VI: SECTION 15: (STOP WORK ORDER) FINE $250.00 PER DAY

    Continued construction after Stop Work Order is issued.

     

    ARTICLE VI: SECTION 13B: (MODULAR HOMES) FINES $250.00 PER DAY

    Failing to set modular on foundation or remove trailers within forty eight (48) hours.

     

    ARTICLE VI: SECTION 15: (COMPACTOR) FINE $1000.00

    Contractors or Sub-contractors using W.L.E. compactor.

     

    ARTICLE VI: SECTION 5: (UNSIGHTLY BUILDING SITE) FINE $1000.00

    Unsightly building site as determined by the Building Compliance Officer or Building Committee.

     

    ARTICLE VII: SECTION 2: (TEMPORARY RESIDENCE) FINE $1000.00

    Temporary structure or outbuildings utilized as a residence.

     

     

    ARTICLE VII: SECTION 12: (COMMERCIAL VEHICLE PARKING) FINE $100.00

    Overnight parking of commercial vehicles over 7500 pounds gross weight.

     

    ARTICLE VII: SECTION 13: (VEHICLE PARKING ) FINE $10.00

    Vehicles parked on W.L.E. roadways.

     

    VIOLATIONS OF THESE BUILDING REGULATIONS, WITH THE EXCEPTION OF THOSE VIOLATIONS FOR WHICH SPECIFIC FINES HAVE BEEN LISTED, WILL RESULT IN A FINE OF $100.00 PER VIOLATION.

    ANY VIOLATION OF THESE BUILDING REGULATIONS, IN ADDITION TO ANY FINES, MUST BE CORRECTED AND BROUGHT INTO COMPLIANCE WITHIN THIRTY (30) DAYS.  FAILURE TO COMPLY WITHIN THIS TIME FRAME MAY RESULT IN THE P.O.A. OBTAINING A CONTRACT TO BRING THE PROPERTY INTO COMPLIANCE AT THE PROPERTY OWNERS EXPENSE.

     

     